Services

What we do around the parts themselves — measuring, grinding, regrinding and the paperwork your quality department asks for.

Every delivery set carries the paperwork

The same four documents ship with every order, at no extra charge.

Material certificate

Steel grade, melt number and the full chemical analysis of the batch the part was cut from.

Hardness report

HRC per batch with the measuring point marked on the drawing.

Measurement report

Actual dimensions against the drawing, taken after grinding.

Customs set

HS codes, packing list and the export documents for your forwarder.

Frequently asked

Three working days in the Istanbul shop once the parts arrive, plus transport. Sets come back with the measurement report and the remaining regrind allowance written on it.

Eight to twelve times for a 1.2379 knife on clean regrind, six to ten on shock loads. We measure the remaining allowance on every cycle and tell you when the set is finished.

Yes. An engineer measures the seat and the original part on your machine before anything is ground, so the replacement sits without shimming.

Yes. We manufacture from an original component, a sample or available technical data using measurement and reverse-engineering methods.

Thank you!

Your request has been sent. An engineer will get back to you within one working day.